Infrastructure of Industrial Park

The Industrial park Greenstate offers land plots ready for the industrial construction with all communications and pre-paid capacities of engineering supply allowed in the volumes required by the Customer's project.

Utilities and infrastructure facilities connected to the  Resident’s plot are the following:

•Access road from Volkhonskoe motorway (public road) to the land plot
•Transformer substation (o, 4 kV or 6 kV)
•Water supply
•Storm sewage
•Sewage
•Gas station, heat supply network
•Fire line
•IT network

The plots are connected to the engineering supply networks according to the supply contracts signed between YIT and local Supplier that include the following capacilities for the industrial park:

Electrical power – 26,6 MW
Heating – 30 MW
Water & sewage – 3000 m3/day
Rain water drainage system
Telecommunication (optical fiber)
Gas pipeline and gas control unit on the parks area
Fire distinguishing system and water reserve tanks
Asphalt roads and railway line inside the industrial park
Own maintenance & management company

Download the Form "Project Initial Data"

Utilities and infrastructure facilities connected to the  Resident’s plot are the following:

•Access road from Volkhonskoe motorway (public road) to the land plot
•Transformer substation (o, 4 kV or 6 kV)
•Water supply
•Storm sewage
•Sewage
•Gas station, heat supply network
•Fire line
•IT network

The plots are connected to the engineering supply networks according to the supply contracts signed between YIT and local Supplier that include the following capacilities for the industrial park:

Electrical power – 26,6 MW
Heating – 30 MW
Water & sewage – 3000 m3/day
Rain water drainage system
Telecommunication (optical fiber)
Gas pipeline and gas control unit on the parks area
Fire distinguishing system and water reserve tanks
Asphalt roads and railway line inside the industrial park
Own maintenance & management company

 

Here you can download the blank of the Project Initial Data

FEEDBACK FORM

To address your question referring to engineering supply in the industrial park Greenstate please fill out the sidebar Query Form and press "Submit" button. We shall make query to out Technical Department and return with the answers asap.

Svetlana Vidlatskaya
Chief of Engineering Project
Mikhail Naletov
CRE Technical Director

Greenstate address and contacts

Industrial Park Greenstate
Southern part of industrial zone Gorelovo, Volkhonskoye shosse 2Б, Lomonosov District, Leningrad Region